Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Sub standard repair been carried out

Reported anonymously at 13:14, Sun 19 May 2019

My original post; Damaged road surface The length of carriageway from the roundabout to beyond the zebra crossing to the entrance to the community centre is dangerous. It is full of raised ironworks presenting a hazzard to cyclists and cars as they have to avoid them by going on the wrong side of the carriageway. The road surface is crumbling away and due to the loose nature, creates a harzzard for cars to slow down effectively in lieu of a person using the crossing. There are a number of potholes in the same stretch causing further hazards. The issue has still not been resolved, the repairs made are inadequate for the volume of traffic. The whole length needs re surfacing not filling the holes in.

Topic:

optional