Various sizes and underlations throughout.
Reported in the Pothole on road/cycleway category anonymously at 13:57, Mon 28 January 2019
Sent to Lincolnshire County Council 2 minutes later. Council ref: 345885.
This has been an issue for a long time, last reported 2015. Ref: 101000061877 The holes / damaged surface will start on the approach to Foul Anchor near the bus stop, the junction leading onto the main road. The holes / damage continues around up to / on the second bridge and leading to St Pauls bungalow of which is the Lincs / Cambs border. The potholes will be visible both in the road and on the verge. The surface of the road is uneven and will lead to slips, trips and falls for pedestrians and potentially may cause vehicle damage as this is a sigle track road.
Updates
-
Thank you for reporting a fault on the highway. We will use the information you have provided to assess and prioritise this fault in accordance with our response times for fault reports which is available at https://www.lincolnshire.gov.uk/ highways-faults
We will contact you again when an update is available.Posted by Lincolnshire County Council at 14:00, Mon 28 January 2019
-
Thank you for reporting a fault on the highway. We will use the information you have provided to assess and prioritise this fault in accordance with our response times for fault reports which is available at https://www.lincolnshire.gov.uk/ highways-faults
We will contact you again when an update is available.Posted by Lincolnshire County Council at 14:29, Mon 28 January 2019
-
We have assessed the fault you reported and will not be taking any action at this time. We will continue to monitor this location as part of our safety inspection schedule.
For information about our routine inspections and works programmes, please visit https://www.lincolnshire.gov.uk/ highways-works-programmesState changed to: No further action
Posted by Lincolnshire County Council at 12:08, Thu 31 January 2019
-
Although you stated you are monitoring the condition of the road, unfortunately, the condition is getting worse and other potholes are appearing through out the length of the road leading up to the end of the Lincs border line. I can probably understand you may not see this as an issue as the road is single track and off the main road, but never the less, it is defective and been subsequently reported several times since 2015.
State changed to: Open
Posted anonymously at 10:31, Sat 16 March 2019
-
This update flows on from the last. The condition of the road is deteriorating and the potholes are getting bigger, especially on the second bridge as the potholes are in line with vehicle wheels.
Posted anonymously at 12:22, Wed 12 June 2019
-
The road has deteriorated as before due to the volume of traffic and is getting worse, even during the lockdown. The weather conditions have not helped either. Please investigate and repair as necessary.
Posted anonymously at 11:50, Wed 3 February 2021
Provide an update
Your information will only be used in accordance with our privacy policy