Closed
The ramp at the roadworks is too big a drop
Reported via desktop in the Problem at LCC roadworks category anonymously at 20:58, Mon 10 May 2021
Sent to Lincolnshire County Council less than a minute later. Council ref: 396335.
At the end of the roadworks on the A15 between Sleaford and Lincoln where the contractors have created a ramp between the old and new surfaces the drop/raise is far too severe.
I was travelling along this stretch and I slowed for the ramp and it sounded like my car underside had hit the ground very hard.
I have been checking the underside of my vehicle for oil leaks in case my sump has been cracked.
Not everyone drives a bid 4x4 with a lot of ground clearance.
Updates
-
Thank you for your report. We will investigate and make an update to this report within 14 days.
Posted by Lincolnshire County Council at 20:58, Mon 10 May 2021
-
Thank you for your report. We will investigate and make an update to this report within 14 days.
Posted by Lincolnshire County Council at 07:31, Tue 11 May 2021
-
State changed to: Investigating
Updated by Lincolnshire County Council at 10:29, Tue 11 May 2021
-
We are sorry but we are not taking immediate action with this report. There is a 40mm difference but it is ramped and the two ramps close together give the impression of a larger drop. Surfacing is imminent and there is a 40mph speed limit in place. Thank you for reporting this matter.
State changed to: No further action
Posted by Lincolnshire County Council at 09:59, Mon 24 May 2021
This report is now closed to updates from the public. You can make a new report in the same location.